The Additive Sections report lists the totals for each vendor's bid for the base sections and all of the selected additive sections in a proposal. Invalid bids are not included.
You can access this report from the Generate Report component, as well as:
To generate the report for a single proposal:
On the Proposal Summary component, from the Actions menu. See Maintaining a Proposal.
On the Proposal Overview or Bid Letting Status Summary components, or on the Proposals tab on the Bid Letting Summary component, from the row Actions menu. See Managing Proposals, Maintaining Bid Letting Status, and Managing Proposals in a Bid Letting.
To generate the report for all proposals, on the Bid Letting Summary component, from the Actions menu. See Changing a Bid Letting.
When you generate the Bid Letting Summary, you can choose to include one or more of the individual reports listed below. You can access these reports from the Generate Report component, as well as:
To generate these reports for a single proposal:
On the Proposal Summary component, from the Actions menu. See Maintaining a Proposal.
On the Proposal Overview or Bid Letting Status Summary components, or on the Proposals tab on the Bid Letting Summary component, from the row Actions menu. See Managing Proposals, Maintaining Bid Letting Status, and Managing Proposals in a Bid Letting.
To generate these reports for all proposals, on the Bid Letting Summary component, from the Actions menu. See Changing a Bid Letting.
The Bid Letting Comparison form lists the proposals by Proposal ID and includes selected proposal information and blank fields for manual entry at the bid letting.
For Cost Plus Time proposals, this report includes the Cost Plus Time Total in the Corrected Low Bid column. The Apparent Low Bid column contains a notation that the proposal is a Cost Plus Time proposal.
The Bid Letting History report lists current letting information and summary information about the low bidder contract if it was previously let and rejected.
The Bid Letting Prequalification report lists all vendors who are prequalified for a particular proposal on a bid letting.
The Letting Award Summary lists information about the winning vendor in a bid letting.
The Proposal Addenda Detail report identifies the changes made to a proposal during the addenda phase by comparing virtual copies (called snapshots) of the proposal at the time each addendum was created, and comparing the last addendum snapshot to the current state of the proposal.
For example, if a proposal has two addenda, the report determines and outputs all the changes between Addenda 1 and Addenda 2 (labeled as Addenda 1), and the changes between Addenda 2 and the current state of the proposal (labeled as Addenda 2's changes). It outputs in Descending Addendum ID order (Addenda 2's changes, then Addenda 1's).
If there are no modifications for the addendum, the report prints No Modifications Found under the addendum header. If there are no addenda for the proposal, the report prints No Addenda for Proposal under the proposal header.
The Bid Tab Analysis Report uses proposal vendor bid information for selected proposals. When you generate this report, you can choose to include one or more of the individual reports listed below. You can access these reports from the Generate Report component, as well as:
To generate these reports for a single proposal:
On the Proposal Summary component, from the Actions menu. See Maintaining a Proposal.
On the Proposal Overview or Bid Letting Status Summary components, or on the Proposals tab on the Bid Letting Summary component, from the row Actions menu. See Managing Proposals, Maintaining Bid Letting Status, and Managing Proposals in a Bid Letting.
To generate these reports for all proposals in a bid letting, on the Bid Letting Summary component, from the Actions menu. See Changing a Bid Letting.
The Low Bid Item Analysis is used to compare the item prices from the low bidder to those in the Engineer's estimate for each selected proposal in the bid letting. The last row of the report displays contract totals, which includes the time bid for Cost Plus Time proposals.
Note: This report uses the item extended amounts calculated by the system rather than those submitted by the bidder.
The Low Bid Summary report lists bid letting totals, including the time bid for Cost Plus Time proposals, and is used to identify the low bidder and compare the corrected low bid value to the Engineer's estimate. The report calculates the low bid as a percentage of the Engineer's estimate and shows how much the bid is over or under the Engineer's estimate.
Note: This report uses the item extended amounts calculated by the system rather than those submitted by the bidder.
The Tabulation of Bids report uses bid information received from proposal vendors to produce a listing of item bid information in a cross tab format to make it easy to compare bids from different vendors. Bidders are listed according to their vendor bid ranking, with the highest ranked bidder listed first.
Note: This report uses the item extended amounts calculated by the system rather than those submitted by the bidder.
If you wish, you can include the Engineer's estimate in the report by choosing the Include Engineer's Estimate option in the parameters window when you run the report. When included, the Engineer's estimate is listed as the first vendor.
The Vendor Ranking report is a list of bidders ranked according to bid total for each selected proposal in the selected bid letting. For Cost Plus Time proposals, the vendor ranking is based on the Cost Plus Time amount rather than the calculated item total.
Note: This report uses the item extended amounts calculated by the system rather than those submitted by the bidder.
If you want, you can include the engineer's estimate in the report by choosing the Include Engineer's Estimate option in the parameters window when you run the report. When included, the engineer's estimate receives a zero ranking, but is ordered in the list according to the total bid amount.
The Bid Tab Edit report analyzes individual line item bids for numerical accuracy and identifies irregular bids. After you generate the report and correct the identified errors, you can regenerate the report to verify your corrections.
You can access this report from the Generate Report component, as well as:
To generate these reports for a single proposal:
On the Proposal Summary component, from the Actions menu. See Maintaining a Proposal.
On the Proposal Overview or Bid Letting Status Summary components, or on the Proposals tab on the Bid Letting Summary component, from the row Actions menu. See Managing Proposals, Maintaining Bid Letting Status, and Managing Proposals in a Bid Letting.
To generate these reports for all proposals in a bid letting, on the Bid Letting Summary component, from the Actions menu. See Changing a Bid Letting.
The Bid Summary and Ranking section of the Bid Tab Edit report ranks each bidder according to the calculated bid total.
Note:These rankings are apparent and the system only considers them to be true rankings if Sections 1 through 4 of the report list no errors.
The Bid Summary section of the Bid Tab Edit report lists errors with proposal bid tabs, such as invalid extended amounts, extended amounts that do not add up to the section or proposal totals.
The Contract Price Schedule report can be generated after either of the following:
the valid low bidder has been determined for a proposal in a bid letting.
a contract has been awarded to the winning bidder.
The name of the report does not change when it is generated on a proposal before it is awarded; it is still the Contract Price Schedule report.
The Contract Price Schedule report uses unit price values from the awarded bidder or the valid low bidder to produce contract-level reports in the following sections:
You can access this report from the Generate Report component, as well as:
To generate these reports for a single proposal:
On the Proposal Summary component, from the Actions menu. See Maintaining a Proposal.
On the Proposal Overview or Bid Letting Status Summary components, or on the Proposals tab on the Bid Letting Summary component, from the row Actions menu. See Managing Proposals, Maintaining Bid Letting Status, and Managing Proposals in a Bid Letting.
To generate these reports for all proposals in a bid letting, on the Bid Letting Summary component, from the Actions menu. See Changing a Bid Letting.
The Final Detail Estimate is a group of reports that uses bid prices from either the awarded vendor or the valid low bidder to provide a project, prime project, or proposal view of costs, including add-on percentages and funding breakdowns.
You can access this report from the Generate Report component, as well as:
To generate these reports for a single proposal or a single prime project:
On the Proposal Overview or Summary component, from the Actions menu. See Maintaining a Proposal.
To generate these reports for all proposals in a bid letting, on the Bid Letting Summary component, from the Actions menu. See Changing a Bid Letting.
The Final Detail Estimate is comprised of six individual reports:
The Final Detail Estimate Cover Page lists the organization, date, project numbers in the proposal, and other general information about the Final Detail Estimate report. For prime projects, the cover page lists each associated project and its price source, either Vendor Price for awarded proposals or Engineer Price for non-bid projects. See Final Detail Estimate Cover Page.
The Final Detail Estimate Cost Summary report can be generated at three levels: project, prime project, and proposal. See Final Detail Estimate Cost Summary.
The project level report provides information about how the project costs are distributed over the different funds in the project's fund packages. The awarded vendor's or valid low bidder's bid prices are organized by project for each funding source, and any funding limits that were set when the project was defined are shown.
The proposal level report provides information about how the project costs are distributed over the different funds in the project's fund packages. The awarded vendor's or valid low bidder's bid prices are organized by proposal for each funding source, and any funding limits that were set when the project was defined are shown. A proposal total is displayed at the end of the report.
The project level report provides information about how the project costs are distributed over the different funds in the project's fund packages. The awarded vendor's or valid low bidder's bid prices are organized by project for each funding source, and any funding limits that were set when the project was defined are shown.
The Final Detail Cost Estimate report can be generated at three levels: project, prime project, and proposal. See Final Detail Cost Estimate.
The project level report lists the quantity, price, and extended amount for each item in the project, based on bid prices from the awarded vendor or valid low bidder. The engineer's estimated price is used for non-bid items. Items are grouped by category and listed in order by line number. The report identifies alternate categories, alternate items, and items that are fixed price, bid lump sum, non-bid, and low cost contributors. The report also includes information about funding source and participation, work classifications, construction classifications, and category length and width. The project total is printed at the end of each project.
The project level report lists the quantity, price, and extended amount for each item in the project, based on bid prices from the awarded vendor or valid low bidder. The engineer's estimated price is used for non-bid items. Items are grouped by category and listed in order by line number. The report identifies alternate categories, alternate items, and items that are fixed price, bid lump sum, non-bid, and low cost contributors. The report also includes information about funding source and participation, work classifications, construction classifications, and category length and width. The project total is printed at the end of each project. The prime project total is printed after the total for the last project.
The proposal level report lists the quantity, price, and extended amount for each item in the project, based on bid prices from the awarded vendor or valid low bidder. Items are grouped by category and listed in order by line number. The report identifies alternate categories, alternate items, and items that are fixed price, bid lump sum, non-bid, and low cost contributors. The report also includes information about funding source and participation, work classifications, construction classifications, and category length and width. The project total and the proposal total are printed at the end of the report.
The Final Detail Estimate Funding Summary report can be generated at three levels: project, prime project, and proposal. See Final Detail Estimate Funding Summary.
The project level report lists all of the funding sources for a proposal. Funds are grouped by category, and the total dollar amount for each category in the proposal is shown.
The prime project level report lists all of the funding sources for a proposal. Funds are grouped by category, and the total dollar amount for each category in the proposal is shown. The prime project total is printed at the end of the report.
The project level report lists all of the funding sources for a proposal. Funds are grouped by category, and the total dollar amount for each category in the proposal is shown. A proposal total is printed at the end of the report.
The Final Detail Estimate Funding Summary by Fund report can be generated at two levels: project and proposal. See Final Detail Estimate Funding Summary by Fund.
The project level report shows the total dollar amount allocated to each category of work from each fund in each project.
The project level report shows the total dollar amount allocated to each category of work from each fund in each project. A proposal total is printed at the end of the report.
The Final Detail Estimate Funding Summary by Fund report can be generated at two levels: project and proposal. See Final Detail Estimate Funding Summary by Unit.
The project level report shows the total dollar amount for each unit of work in the project by funding source. Unit numbers are assigned to categories to form groups of categories when project-level funding is added to each project. If no unit number is assigned, the unit number shown on the Funding Summary report is None.
The project level report shows the total dollar amount for each unit of work in the project by funding source. Unit numbers are assigned to categories to form groups of categories when project-level funding is added to each project. If no unit number is assigned, the unit number shown on the Funding Summary report is None. A proposal total is printed at the end of the report.
The Proposal Fiscal Year Schedule report shows what percentage of work should be completed in each fiscal year of a proposal. It lists the Percent Time Elapsed and Percent Funds Expended for each fiscal year and ends with a row of totals.
You can access this report from the Generate Report component, as well as:
To generate the report for a individual proposal:
On the Proposal Overview component, from the Actions menu. See Maintaining a Proposal.
To generate the report for all proposals, on the Proposal Overview component, from the Actions menu. See Managing Proposals.
You can generate and print mailing labels when you need to mail documents or correspondence to a vendor or group of vendors. You can print one, two, three or a whole sheet of labels at a time for each vendor you select. Default settings accommodate the standard Avery 5160 peel-off self-adhesive label paper, however, your agency can modify these settings to use another label paper stock if desired. See Steps for Customizing a Report.
You can generate vendor mailing labels by the following:
Select Generate Report from the Actions menu on the component header.
The system takes you to the Generate Report component, which lists all the reports you can generate.
In the list of reports, select the appropriate Mailing Labels option for the labels you want to generate. (Depending on the vendor list page on which you are working, this option might be named RefVendor Mailing Labels, Proposal Vendor Mailing Labels, or Awarded Vendor Mailing Labels.)
TThe system adds a check mark beside the label you select and shades the row. To cancel a selection, click the selected row again.
To select the vendors for whom you want to print labels, choose Select Data on the Settings menu on the component subheader.
The system displays a Quick Find search box for locating the vendors.
Select the vendors you want included in the report.
Type criteria in the Quick Find search box or click Show first 10
The system displays a list of all the vendors in the system that match your search criteria.
Select Set Parameters from the Settings menu on the component subheader.
The system displays parameter options for the mailing labels.
In the Number of Labels box, choose the option for the number of labels you want to print for each selected vendor (1, 2 3 or whole page).
In the AddressID field, type the ID of the address you want to print. If you are printing labels for multiple vendors, you must use the same Address ID for all vendors.
Click the Execute button on the component header.
The system displays the mailing labels in a separate browser window.
To print the labels, click the Print button on your browser's toolbar.
Note: When you are printing the report PDF file from the browser or PDF Reader, you might need to set the Page Scaling option in the Page Handling section of the Print window to None if you are printing mailing labels for vendors that have 9 digit zip codes or several address lines..
The Notice to Contractors report serves as a legal notice to the public that proposals are available for bid and is submitted to the media for publication. The report contains two parts, a cover page and a proposal item quantities list. For Cost Plus Time proposals, each Cost Plus Time site is displayed along with the Road User Cost Per Day amount.
You can access this report from the Generate Report component, as well as:
To generate the report for a single proposal:
On the Proposal Summary component, from the Actions menu. See Maintaining a Proposal.
On the Proposal Overview or Bid Letting Status Summary components, or on the Proposals tab on the Bid Letting Summary component, from the row Actions menu. See Managing Proposals, Maintaining Bid Letting Status, and Managing Proposals in a Bid Letting.
To generate the report for all proposals, on the Bid Letting Summary component, from the Actions menu. See Changing a Bid Letting.
Also referred to as the PS&E Estimate, the Preliminary Detail Estimate is a group of reports that uses the Engineer's estimated prices to provide a project, proposal, or prime project view of costs, including add-on engineering and contingency percentages and funding breakdowns.
You can access this report from the Generate Report component, as well as:
To generate the report for a single proposal or a single prime project:
On the Project Overview or Summary component, from the Actions menu. See Maintaining a Project.
On the Proposal Overview or Bid Letting Status Summary components, or on the Proposals tab on the Bid Letting Summary component, from the row Actions menu. See Managing Proposals, Maintaining Bid Letting Status, and Managing Proposals in a Bid Letting.
To generate the report for all proposals, on the Bid Letting Summary component, from the Actions menu. See Changing a Bid Letting.
You can access the 6 Preliminary Detail Estimate individual reports:
The Final Detail Estimate Cover Page lists the organization, date, project numbers in the proposal, and other general information about the Final Detail Estimate report. For prime projects, the cover page lists each associated project and its price source, either Vendor Price for awarded proposals or Engineer Price for non-bid projects. See Final Detail Estimate Cover Page.
The Preliminary Detail Estimate Cover Page can be generated at three levels: project, proposal, and prime project.
When the Detail Estimate is generated at the proposal level, the Cover Page lists the organization, date, project numbers in the proposal, and other general information about the Detail Estimate report.
When the Detail Estimate is generated at the prime project level, the Cover Page lists the organization, date, project numbers associated with the prime project, and other general information about the Detail Estimate report..
The Preliminary Detail Estimate Cost Summary can be generated at three levels: project, proposal, and prime project. Although these reports contain the same information, the data is organized and totaled according to either project, proposal, or prime project, as appropriate.
The project level report provides information about how the estimated project costs are distributed over the different funds in the project's fund packages. Separate reports are generated for each project you select to include. The reports include funding sources and any funding limits that were set when the project funding was defined, along with project total amounts.
The proposal level report provides information about how the estimated project costs are distributed over the different funds in the project's fund packages. Separate reports are generated for each proposal you select to include. The reports include funding sources and any funding limits that were set when the project funding was defined, along with project and proposal totals.
The prime project report provides information about how the estimated project costs are distributed over the different funds in the project's fund packages. Separate reports are generated for each prime project you select to include. The reports include funding sources and any funding limits that were set when the project funding was defined, along with project and prime project totals.
The Preliminary Detail Cost Estimate can be generated at three levels: project, proposal, and prime project. Although these reports contain the same information, the data is organized and totaled according to either project, proposal, or prime project, as appropriate.
The project level report lists the quantity, price, and extended amount for each item in the project. The report includes information about funding source and participation, work classifications, construction classifications, and category length and width. The estimate total is printed at the end of the report.
The proposal level report lists the quantity, price, and extended amount for each item in the proposal. The report includes information about funding source and participation, work classifications, construction classifications, and category length and width. The project total is printed at the end of each project in the proposal and the proposal total is printed at the end of the report.
The prime project level report lists the quantity, price, and extended amount for each item in the prime project. The report includes information about funding source and participation, work classifications, construction classifications, and category length and width. The project total is printed at the end of each project associated with the prime project, and the prime project total is printed at the end of the report.
The Preliminary Detail Estimate Funding Summary can be generated at three levels: project, proposal, and prime project. Although these reports contain the same information, the data is organized and totaled according to either project, proposal, or prime project, as appropriate.
The project level report lists all of the funding sources for a project. Funds are grouped by category, and the total dollar amount for each category in the project is shown.
The proposal level report lists all of the funding sources for a proposal. Funds are grouped by category, and the total dollar amount for each category in the proposal is shown.
The prime project level report lists all of the funding sources for a prime project. Funds are grouped by category, and the total dollar amount for each category in the prime project is shown.
The Preliminary Detail Estimate Funding Summary by Fund report can be generated at three levels: project, proposal, and prime project. Although these reports contain the same information, the data is organized and totaled according to either project, proposal, or prime project, as appropriate.
The project level report shows the total dollar amount allocated to each category of work from each fund in the project.
The proposal level report shows the total dollar amount allocated to each category of work from each fund in each project in the proposal, along with totals for the proposal.
The prime project level report shows the total dollar amount allocated to each category of work from each fund in the prime project, along with totals for the prime project.
The Preliminary Detail Estimate Funding Summary by Unit report can be generated at three levels: project, proposal, and prime project. Although these reports contain the same information, the data is organized and totaled according to either project, proposal, or prime project, as appropriate.
The project level report shows the total dollar amount for each unit of work in the project by funding source. Unit numbers are assigned to categories to form groups of categories when project-level funding is added to the project record. If no unit number is assigned, the unit number shown on the Funding Summary report is None. Data is totaled by project.
The proposal level report shows the total dollar amount for each unit of work in the proposal by funding source. Unit numbers are assigned to categories to form groups of categories when project-level funding is added to each project in the proposal. If no unit number is assigned, the unit number shown on the Funding Summary report is None. Data is totaled by project and proposal.
The prime project level report shows the total dollar amount for each unit of work in the prime project by funding source. Unit numbers are assigned to categories to form groups of categories when project-level funding is added to each project associated with the prime project. If no unit number is assigned, the unit number shown on the Funding Summary report is None. Data is totaled by project and prime project.
The Proposal Addenda report lists all the addenda for one or more proposals. Proposals are listed in ascending order, one proposal per page. Addenda header information is listed in descending order for each proposal.
You can access this report from the Generate Report component, as well as:
To generate these reports for a single proposal:
On the Proposal Summary component, from the Actions menu. See Maintaining a Proposal.
On the Proposal Overview or Bid Letting Status Summary components, or on the Proposals tab on the Bid Letting Summary component, from the row Actions menu. See Managing Proposals, Maintaining Bid Letting Status, and Managing Proposals in a Bid Letting.
To generate these reports for all proposals in a bid letting, on the Bid Letting Summary component, from the Actions menu. See Changing a Bid Letting.
Generating the Proposal Price Schedule report uses the engineer's estimated values to produce these four reports:
The Proposal Cover Sheet is the first section of the Proposal Price Schedule group report. The Proposal Cover Sheet provides two pages of general information about the proposal and the projects associated with it.
The first page of the Proposal Cover Sheet lists the projects, counties, and districts associated with the proposal. The second page includes the date the report was run, a description of the proposal, alternate category information, alternate item information, and, for cost plus time bidding, proposal time information.
The Proposal Schedule of Items is part of the Proposal Price Schedule group report and contains a listing of biddable proposal items similar to the listing displayed on the Proposal Item List page. The report is subdivided by sections and shows section totals. For cost plus time proposals, a section containing proposal time information is included.
This report can be used by contractors to submit their proposal item bid prices to the agency.
The Proposal Estimate is part of the Proposal Price Schedule group report and is similar to the Schedule of Items Report, but with these differences:
This report can be used by contractors to submit their proposal item bid prices to the agency.
The Unit Price field for each proposal item is populated with the Proposal Item Unit Price for the corresponding proposal item.
The Unit Price for lump sums, hybrid lump sums, and fractional lump sum items remains LUMP SUM.
The Extended Amount field for each proposal item is populated with the Proposal Item Extended Amount for the corresponding proposal item.
The Total Bid value for the proposal is replaced by the Estimated Total, which is the estimated low cost total proposal cost taking design alternates into consideration.
Vendor Invoices are generated for each planholder in a proposal and used in billing for the purchase of proposal plans in a bid letting. The invoices are generated by Invoice Number.
You can access this report from the Generate Report component, as well as:
To generate these reports for a single proposal:
On the Proposal Summary component, from the Actions menu. See Maintaining a Proposal.
On the Proposal Overview or Bid Letting Status Summary components, or on the Proposals tab on the Bid Letting Summary component, from the row Actions menu. See Managing Proposals, Maintaining Bid Letting Status, and Managing Proposals in a Bid Letting.
To generate these reports for all proposals in a bid letting, on the Bid Letting Summary component, from the Actions menu. See Changing a Bid Letting.