The Phase Ranges tab on the Cost Estimate Snapshot Contingency Assignment Summary lists all of the estimation phase ranges that were recorded for the contingency when the snapshot was created.
In each phase range row, you can view read-only values in these fields:
Maintaining a Cost Estimate Snapshot
Viewing Contingency Assignment Information for a Snapshot
Viewing a Contingency Assignment in a Snapshot