Maintaining Contract Project Points

A project point is used to locate a specific site for project work or the site for a portion of the project's work.  A point can be described by a single latitude and longitude measurement.

A point can also be defined as a set of three spatial coordinates (X, Y, Z) for use in GIS applications. Adding three-dimensional coordinates to a point record enables your agency to connect data much more efficiently. For example, an agency needs to know what highway projects fall within a newly-defined Threatened or Endangered Species habitat. If the project point data is spatially enabled, this can take seconds to perform in a GIS program, but could take weeks to develop the project list if performed manually.

When you click the Points tab on the Contract Project Summary, the system displays an accordion list of all the points associated with the contract project. Each row represents one point and displays the Type and Description fields and an Actions button.

To maintain a point record, expand the row to display all the available information. You can add and change information in these fields:

 

To add or change spatial coordinate information for the project point, expand the Location section of the row. You can add or change information in these fields:

 

To delete a project point, select Delete from the Actions menu on the point row. To reverse the delete action, click the Undo button.

When you are finished, click the Save button. The system displays a message to confirm that your changes were saved in the database.

Adding Location Points to the Contract Project

To add a new location point to the contract project, click the New button on the Points tab. The system adds a new row at the bottom of the list of points. All fields in the new row are blank.  

To create a contract project point record, you must enter information in the Type, Latitude, Longitude, and Description fields.

If the point is associated with a particular category in the project, you can also enter that information in the Category ID field.

When you are finished, click the Save button. The system displays a message to confirm that your changes were saved in the database.

Related topics:

Maintaining a Contract Project

 

Blue bar indicating the end of the topic